World’s Longest Assembled 3D Printed Boundary Wall for TNCA – Chepauk Stadium, Chennai (2022)
In 2022, Tvasta designed and developed the world’s longest assembled 3D printed structure for the Tamil Nadu Cricket Association at the iconic Chepauk Stadium in Chennai. Fabricated using Tvasta’s proprietary additive manufacturing process, the boundary wall was...
India’s First 3D Printed Security Pavilion for Godrej & Boyce – Vikhroli, Mumbai (2023)
In 2023, Tvasta collaborated with Godrej & Boyce to deliver India’s first 3D printed security pavilion at the company’s Vikhroli campus in Mumbai. Strategically located at Gate No. 7 along the Eastern Express Highway, the structure was meticulously designed,...“The Cocoon” – 3D Printed Modular Office for Godrej & Boyce – Khalapur (2023)
In 2023, Tvasta collaborated with Godrej & Boyce to deliver a 500 sq. ft. modular office structure titled “The Cocoon” at the company’s greenfield campus at Khalapur. Executed as an off-site construction project, the structure was completed within an accelerated...

